In New York City, the largest private real estate development in the history of the United States took place. Right in the heart of Manhattan, where there hasn’t been open land to build on for decades, over 7,000,000 square feet of development took place in the Hudson Yards New York Project. How is that possible? By building a platform over the existing land use and then building a development on top of that platform. Pittsburgh Pipe is proud of our contributions to this significant and historic project. We’ve provided more than 400 Drilled Shafts outfitted with cutting teeth, turning slots and picking eyes that are quite literally the foundation of the entire enterprise!
Prior to the start of this project, the 28 acre site was the location of 30 active Long Island Rail Road train tracks, three subsurface Amtrak rail tunnels and a New Jersey passageway for the Gateway tunnel. Necessary to New York’s public and non-public transportation systems, these assets wouldn’t and couldn’t be removed. Designers and architects came up with a plan to build a development over the top of the existing rail use by building a massive plat-form over the rail yards and then building up towards the sky from there.
The foundation for this massive building platform was the key to the entire development. This platform and the buildings to be built above it are supported by a total of 300 caissons, ranging from four to five feet in diameter and 20 to 80 feet in depth, drilled deep into bedrock at strategic locations between existing railroad tracks and then filled with concrete. Oh, who is the vendor who manufactured and supplied these 300 caissons to support a city within a city in the biggest city in America? Well that would be none other than Pittsburgh Pipe!
Beginning in 2014, Pittsburgh Pipe began the meticulous process of manufacturing these caissons to the exact specifications of the developer. Many of these caissons contain turning slots, picking eyes, grout holes and cutting teeth. Throughout all of the project’s construction, the Long Island Rail Road, Amtrak and New Jersey Transit remain operational.
It is anticipated that more than 24 million people will visit Hudson Yards every year. The site will ultimately include more than 17 million square feet of commercial and residential space, 5 state-of-the-art office towers, more than 100 shops, a collection of restaurants, approximately 5,000 residences, a unique cultural space, 14 acres of public open space, a 750-seat public school and an Equinox® branded luxury hotel with approximately 200 rooms—all offering unparalleled amenities and easy access to transportation for residents, employees and guests. This massive project is literally supported by Pittsburgh Pipe.
Contact Us at 2331 Hampton Ave., St. Louis, MO 63129 or click to call us!
About Pittsburgh Pipe
At Pittsburgh Pipe, we offer many different products and services. We strive to be the best at what we do and to provide the best products. We put a lot of time and effort into making sure our steel pipe is the best in the industry.
Serving Coast to Coast
HEADQUARTERS
2331 Hampton Avenue
Saint Louis, MO 63139
PHONE
314.383.5300
800.325.2653